We will vigorously develop clean energy by building photovoltaic power stations in Huaiyu Township and other areas. A total of 1,188 high-efficiency 260Wp solar modules have been installed, covering an area of approximately 5,000 square meters, with a total system capacity of 308.88 kWp and an on-grid power output of 340,000 kWh, effectively reducing carbon emissions.

Energy efficiency measures have been adopted for buildings. Energy-efficient buildings account for more than 80% of the total floor area in the geopark, and 21 "foam-microbial environmental protection toilets" have been newly built or renovated.

The Geopark actively builds a green transportation system and vigorously promotes public transport. By launching public transfer lines in the main areas, visitors are encouraged to use electric buses and reduce private car use. Dedicated cycling lanes have also been built in the Geopark, effectively guiding low-carbon travel.

Promote an online reservation system to reduce the use of paper tickets.
Advocate energy conservation and emission reduction, and save electricity and water.
Implement waste classification, recycle renewable resources, and reduce waste volume.
